Marina Update

The lift in on May 12 went very well, all boats that require the crane are now in the water.

Speaking of water, the break in the water line supplying B dock was repaired today.  Water is now in service on B dock, and will be in service on A dock in the next few days.  The break in the water line serving C dock is more serious, and will not be repaired until sometime next week.  Excavation will be required and a new line run from the curb stop to the dock.  We will update this post as repairs progress.